Similar Posts
Annual Procurement Plan (APP) for the Year 2024-2025
Posted on
APP Annual Procurement Plan for the year 202-2025 SL. No Name of the Work Estimated Cost Specifications/Detail Documents 1 Underground Optical Fiber network…
WID635: DTW-119 a new UVR installation.
Posted on
Dtw-119 এর LV panel এ একটি নতুন UVR স্থাপন করা হয়েছে। তবে UVR টি নতুন মডেলের হওয়ার কারণে এর Terminal tag ও cabling…
Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )
Posted on
SL No. DTW No Cleaning POE Switch ONU UPS 01. 101 Completed OK OK Problem 02. 102 Completed OK OK Problem 03. 103…
WID639: DTW-213 1 Nos bullet camera maintenance.
Posted on
Cable connector pin damage found. Change UTP connector & PoE to ONU short cable.