Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Dtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .
1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation
Due to facing lots of obstacles in front of line of sight, the radio signal is too much worst
IRP-1 All LOP Panel Cleaning Done