Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.
25.11.2023 today I collect the LIT from DTW-113
IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust
Due To Strom the optical fiber cable fall down and damage near DTW-209 to 206 Now Everything is Normal
Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…
IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust