Similar Posts
VCB Installation & Commissioning
Posted on
Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check.
Posted on
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
Radio Communication Report 2022
Posted on
Radio Communication Report October 2022 SL NO. DTW NO. Antenna Status RSSI/DCV Type Communication Status Remarks 01 101 13.2 16.4 ❎ Level fluctuate…