Similar Posts
FIT-3001 Maintenance
Posted on
After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…
SCADAPACK Report 2022
Posted on
SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
IRP-1 sand filter “E” ultrasonic level transmitter installing.
Posted on
New parameter setting on an old ultrasonic level transmitter and installing complete. now sand filter “E” is normal. SCADA value & field value…
IRP-2 Server Rak Installation
Posted on
IRP-2 Sub-Station 1Nos New Server Rack Installation Done