IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
Similar Posts
IRP-1/2 Optical Fiber Maintenance Report
Posted on
IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
DTW-221,217,123 VFD Controller And Serial Communication Check
Posted on
DTW-221,217,123 Modbus communication Problem DTW-221 & 217 new serial communication cable install DTW- 123 VFD controller and Modbus serial communication cable check Done….
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
4 nos Monitoring Well Level Sensor Installation Complete.
Posted on
1 :MW03B 2: MW14A 3:MW08A 4: MW13B
IRP-2 All FCP panel cleaning
Posted on
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
DTW- 221 VFD And LIT Installation
Posted on
Modbus Serial communication cable check Complete. No problem Found in the Field LIT Do Not Down in The Boring After 10 Meter
ACTIVITY | DAILY REPORTS | Pappu | REPORTS
IRP-2 ALL LOP Panel Cleaning
Posted on
There was so much dust