IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.



DTW-106 CCTV Base Placement Done
Level Sensor Report October 2022 SL NO. DTW NO. STATIC LEVEL PUMPING LEVEL Type STATUS 01 101 5.8 ❎Level Sensor problem. 02…
Unused & damage LIT sensor collects complete from DTW 105 – 1 nos DTW 106 – 1 nos & new lit sensor install.DTW…
Problem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…
DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING COMPLETE There was so much dust
IRP-1 CCTV monitor HDMI cable plug & power up Done