REMOTE TERMINAL UNIT of DTW106 INSPECTION
Posted on
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…
ACTIVITY | DAILY REPORTS | MOV | Parvez | Uncategorized
WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.
Posted on
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.

Md. Faysal Zaman – Monthly Task Plan( 26 June – 26 July)
Posted on
Task List

IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.
Posted on
Cleaning Completed.
SCADA Daily Report
Posted on
ICE ISSUES SL No Work ID Date Description Status Remarks / Log 78 243 6/4/2023 (NEW)DTW-116 communication fully error.now it’s locally running pending…