There was so much dust
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…
Findings: 1. Optical fiber are found damaged. Action Taken: 1. OTDR test . Cable disconnect at 0.7634 km. 2. Physically cable & TJ…
Findings: PIT internal CKT damaged found. Action Taken: Install new pressure transmitter.
Work List (Preventive Maintenance)
Task List