Similar Posts

IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.
Posted on
RTU Panel cleaning completed.
WID590: IRP-1 OGR utility pump problem check.IRP-1 OGR utility pump problem check.
Posted on
Findings: Switch problem found. Action taken: Switch replace.

Switch Gear Panel Arrangement Drawing Handover
Posted on
Switch Gear Panel Arrangement Drawing Handover to Mr. Pappu(Assistant Shift Operator) and Mr. Parvez(Automation Technician) today (30.05.2022) at 1.43PM.
IP Address of PWTP
Posted on
WID635: DTW-119 a new UVR installation.
Posted on
Dtw-119 এর LV panel এ একটি নতুন UVR স্থাপন করা হয়েছে। তবে UVR টি নতুন মডেলের হওয়ার কারণে এর Terminal tag ও cabling…
WID633: Dtw-123 main UPS alarm problem.
Posted on
Lose connection problem found.