1 Nos logger drop down due to lack of supporting SS ‘O’ ring.
Need to take proper steps to pull up the Logger in maintenance period.















1 Nos logger drop down due to lack of supporting SS ‘O’ ring.
Need to take proper steps to pull up the Logger in maintenance period.
Work List (Preventive Maintenance)
IRP-1 OGR Booster pump (D,E,F) controlling Variable Frequency Drive internal circuit & components cleaning…..
Abstract Recommended Devices(Priority Based) Cambium PTP 550 Integrated 5GHz 1.36Gbs Point to Point Radio Link + Ubiquiti Air Fiber 5X HD -1Gbps+ Carrier…
SL No. DTW No. Serial Comm. Condition Generator Battery Cable Remarks 01 101 Okay Okay Okay 02 102 Okay Okay Okay …
SL. No. Date WID: TaskDescription Location Manpower Remarks 2 November PWID60: DTW-101 RTU, LIT, PIT, FIT clean check & maintenance. DTW-101 Parvas-AT Ahsanullah-Ele…