Similar Posts
Radio Device Selection for IRP1 to IRP2 PLC Communications
Posted on
Abstract Recommended Devices(Priority Based) Cambium PTP 550 Integrated 5GHz 1.36Gbs Point to Point Radio Link + Ubiquiti Air Fiber 5X HD -1Gbps+ Carrier…
WID632: Dtw-106 ELD problem check.
Posted on
On/Off switch problem found. Need to change the switch. On/Off switch replace done. Now ELD operational.
MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)
Posted on
SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…