Similar Posts
- ACTIVITY | DAILY REPORTS | MOV | Parvez | Uncategorized
WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.
Posted onFinding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
A good model uses premium supplies
Posted onNew Vapes 2026 Latest Disposable & Pod Kits Our borosilicate glass bongs ship distinctive performance. Lookah ensures you get one of the best…
IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance.(June-July,2022)
Posted onDTW – 107, 109, 119 CCTV panel cleaning completed. DTW 115, 118 DTW 114, 118
VFD cleaning at OGR
Posted onIRP-1 OGR Booster pump (D,E,F) controlling Variable Frequency Drive internal circuit & components cleaning…..
CCTV maintenance Report – January 2024
Posted onSL. No. DTW No./Camera Problem Findings Maintenance Remarks 01 201/1 Cable damage. UTP cable core interchange. 5 Nos cameras are operational. 02 205/1…
