WID590: IRP-1 OGR utility pump problem check.
Posted on
Findings: Flote Switch mis-displacement problem found. Need to dressing the cable with cable tie.
IRP-2 Dome Camera and Panel preventive maintenance.
Posted on
All Dome camera front side and panel cleaning completed. Issues Inside Panel water existence found after raining.
SCADA Operation Roles and Responsibilities for Deep Tube wells
Posted on
General Dhaka WASA adopted Supervisory Control and Data Acquisition (SCADA) system for digitalized handy operation practice for decision making officers, pursuing unmanned operation…
WID594: Dtw-203 Radio communication error. Need to check.
Posted on
Findings: SCADAPack STAT-LED blinking in Red signal. Action Taken: Restart the SCADAPack & radio modem.