Similar Posts
SCADA Operation Roles and Responsibilities for Deep Tube wells
Posted on
General Dhaka WASA adopted Supervisory Control and Data Acquisition (SCADA) system for digitalized handy operation practice for decision making officers, pursuing unmanned operation…
Equipment’s List for SKWP [Category Wise]
Posted on
PLC SL NO ITEM NAME BRAND NAME MODEL DC Power Supply ACRO AD1048-24FS Industrial S-ring Switch Sol Tech SFC8000 Fiber Optic Terminantion Box…
DTWs as on Locally Operational
Posted on
DTW101 Problem: Dtw-101 Sometimes the pump stops suddenly. This has happened time and time again. There is no fault in SCADA. Field check…
WID590: IRP-1 OGR utility pump problem check.IRP-1 OGR utility pump problem check.
Posted on
Findings: Switch problem found. Action taken: Switch replace.