MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)
Posted on
SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
WID616: DTW-107 LIT, PIT, FIT isolation due to regeneration work.
Posted on
Due to regeneration work, We disconnect the connection of LIT, PIT, FIT.
WID599: DTW-121 serial communication problem. Need to check.
Posted on
Findings: 1. Always PWP panel inverter fault is showing. 2. Magnetic Contact coil damaged found. Action Taken: Magnetic contact change.

IRP-2 Dome Camera and Panel preventive maintenance.
Posted on
All Dome camera front side and panel cleaning completed. Issues Inside Panel water existence found after raining.
DTW114 Local Pipeline MOV-1 automatic close when MOV-1 turn in Remote mode
Posted on
Checking Step SL Checking Stage Remarks MOV physical status (Wiring, OK 1 MOV to RTU Panel Terminal MOV ok. 2 SCADAPACK Analog output…