In all DTW, there have lot of essential electronic devices that protect & control our system. UVR & ELD are playing a important role among them. So, Team ICE take a schedule of cleaning these devices.
Similar Posts
REMOTE TERMINAL UNIT of DTW106 INSPECTION
Posted on
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…
Training on DTW and CCTV Local Operation and Reporting For Emergency Situation
Posted on
By ICE Team Trainee: Operation Team A প্রেক্ষাপট বিগত কিছু দিন যাবত দেখা যাচ্ছে, যে স্কাডা থেকে অপারেশন টিমের মেম্বাররা ফিল্ডে গিয়ে কোন…
One Comment