











All Dome camera front side and panel cleaning completed.
Issues




Inside Panel water existence found after raining.
All Dome camera front side and panel cleaning completed.
Inside Panel water existence found after raining.
There is no excerpt because this is a protected post.
RTU Panel cleaning completed.
SL. No Name/Brand Model Location Type Remarks 01 Mid-range PAC industrial process and infrastructure control “All-in-one CPU”7 Kinst/msMultitasking system for guaranteed reflex timeUSB…