Md. Faysal Zaman – Monthly Task Plan( 26 June – 26 July)
Posted on
Task List
ACTIVITY | DAILY REPORTS | MOV | Parvez | Uncategorized
WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.
Posted on
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
Monthly Work Plan ( Jun-July )for Pappu Dhar
Posted on
Work List (Preventive Maintenance)
REMOTE TERMINAL UNIT of DTW106 INSPECTION
Posted on
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…
Optical Fiber Maintenance For DTW-115 To 119
Posted on
Fiber Join and cable arrangement Now DTW-115,117,118,119 CCTV Operation in NAV-2
WID566: NAV-3 & NAV-4 Cameras aren’t shown in display.
Posted on
Findings: 1. Optical fiber are found damaged. Action Taken: 1. OTDR test . Cable disconnect at 0.7634 km. 2. Physically cable & TJ…