After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is very bad.
Similar Posts
Instrumentation of Month (September,2022)
Daily Work Plan September 2022đ SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: â PAPPU,…
DTW-211 Serial Communication Cable check and Rejoin
DTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal
DTW-115 VFD fault problem maintenance.
VFD modbus interrupt problem found. Than reset the VFD.
DTW – 111 LIT Maintenance Work Complete.
Dtw 111 LIT Reinstallation complete . DTW 111 āĻĨā§āĻā§ āĻĒā§āĻ°āĻžāĻ¤āĻ¨ āĻāĻāĻāĻŋ LIT āĻ¸ā§āĻā§āĻ°ā§ āĻāĻŽāĻž āĻĻā§ā§āĻž āĻšā§ā§āĻā§ ā§ˇ
IRP1 Sludge drying bed float switch checking.
Problem found: Sludge bed āĻā§āĻŽā§āĻŦāĻžāĻ°ā§ āĻāĻžāĻĻāĻžāĻ° āĻĒāĻ°āĻŋāĻŽāĻžāĻ¨ āĻŦā§āĻļāĻŋ āĻšāĻā§āĻžāĻ° āĻāĻžāĻ°āĻ¨ā§ ā§ˇ LoLo āĻ¸āĻŋāĻāĻ¨āĻžāĻ˛ā§āĻ° āĻĢā§āĻ˛ā§āĻ āĻ¸ā§āĻāĻāĻāĻŋ āĻāĻžāĻĻāĻžāĻ° āĻŽāĻ§ā§āĻ¯ā§ āĻ āĻžāĻāĻā§ āĻ¯āĻžāĻā§āĻā§ ā§ˇāĻ¤āĻžāĻ āĻ¸ā§āĻāĻžāĻĄāĻžāĻ¤ā§ HiHiLoLo āĻ¸āĻŋāĻāĻ¨āĻžāĻ˛…