Similar Posts
Preventive work schedule Nov-2023 (Kazi Jewel)
Posted on
SL. No. Date WID: TaskDescription Location Manpower Remarks 01 1 November WID1: DTW-207 Optical Fiber maintenance. DTW-206 & 207 Kazi Jewel-HRasel Mizi-HGias Uddin-H…
DAILY REPORTS | DTW | Parvez | REPORTS | Uncategorized
WID562:DTW217 flow value is not shown in SCADA
Posted on
Findings: The cable was disconnected. Action taken: Dressing the cable and reconnect.
PWTP PLC Cabinet
Posted on
SL. No Name/Brand Model Location Type Remarks 01 Mid-range PAC industrial process and infrastructure control “All-in-one CPU”7 Kinst/msMultitasking system for guaranteed reflex timeUSB…
Preventive working schedule-Nov2023( Md. Parvas)
Posted on
SL. No. Date WID: TaskDescription Location Manpower Remarks 2 November PWID60: DTW-101 RTU, LIT, PIT, FIT clean check & maintenance. DTW-101 Parvas-AT Ahsanullah-Ele…