




Findings: 1. When we power up the UPS breaker, At that moment the ELD’s Fuse burn.
There was so much dust
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…