Due to facing lots of obstacles in front of line of sight, the radio signal is too much worst
2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
DTW-114 PIT ok. DTW-113 PIT ok but scadapack AO port damaged. DTW-104 PIT doesn’t exist. DTW-105 PIT ok (regeneration on going)