ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS
DTW-109 Radio Communication Check
Posted on
The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…
IRP-2 Server Rack Installation and Optical Fiber Rejoin
Posted on
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | Pending Issue
DTW- 206 RTU Panel Power System Checking & Problem Found.
Posted on
problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.
ACTIVITY | DAILY REPORTS | DTW | Pappu
Unused & damage LIT sensor collects complete from DTW 105,106,115,203 & 212
Posted on
Unused & damage LIT sensor collects complete from DTW 105 – 1 nos DTW 106 – 1 nos & new lit sensor install.DTW…
Instrumentation of Month (September,2022)
Posted on
Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…
ACTIVITY | DAILY REPORTS | MOV | Parvez | Uncategorized
WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check.
Posted on
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.