In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this DTW was out of our security system.














In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this DTW was out of our security system.
CCTV modification work for Dual power source Done Now CCTV continuous View remain All time.
1.one new camera installation 2. Connector Change 3.IP Setup
The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…
After visited to IRP2, we saw that lots of water inside the chamber and the condition of the flow meter flow detector is…