			IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
 
			DTW-106 CCTV Base Placement Done
The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…
 
			1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done
 
			Problem: Do not show footage in NAV.Problem found: POE Switch problem & 1 nos cc camera damage found and New POE Switch installing. Now problem…
Previous ONU frequently becomes unstable/hang. So replace the ONU.