Similar Posts

DTW-202 Running Time Motor Frequency (-) Minus Showing
Posted on
Issue Forward to the electrical team.

CCTV Maintenance At DTW- 202
Posted on
1.Cable connector change 2. IP Setup

IRP-1 DTW RTU,VFD & CCTV Panel Cleaning
Posted on
Dtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .
ACTIVITY | DAILY REPORTS | Parvez | REPORTS
IRP-1 All sandfilter ultrasonic sensor cleaning
Posted on
IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust

Optical Fiber Network Report 2022
Posted on
Optical Fiber Network Status October 2022 SL NO. Location In Between DTW Near Pole No Lat/Long Affected Location Remarks 01 Baherchor to Bottoli…

ACTIVITY | DAILY REPORTS | Parvez | REPORTS
OGR Booster room dewatering pump run command showing problem at low level
Posted on
Float switch reconnection and rearrange. Now normal