Similar Posts
IRP-1 DTW (101 to123) SCADAPACK, TRIO JR,LIT & PIT REPORT.
Posted onDTW SCADAPACK TRIO JR LIT PIT COMMENTS 101 OK OK OK OK 102 OK OK NOT OK OK 103 OK OK OK OK…
DTW-212 & 222 CCTV Maintenance
Posted onDTW-212 & 222 CCTV Maintenance Done Connector Change Now DTW-212 & 222 10 No’s CCTV Operation in NAV
ACTIVITY | DAILY REPORTS | DTWDTW-113 Scada Pack Install
Posted onDTW-113 Scada Pack Programing And Install Done
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTSIRP-2 Sand Filter All Ultrasonic Sensor Cleaning
Posted onIRP-2 Sand Filter All Ultrasonic Sensor Cleaning Complete.
ACTIVITY | DAILY REPORTS | Parvez | REPORTSOGR Booster room dewatering pump run command showing problem at low level
Posted onFloat switch reconnection and rearrange. Now normal
ACTIVITY | DAILY REPORTS | Parvez | REPORTSDTW-219 & 220 Cleaning
Posted onDtw-220 & 219 RTU, VFD & CCTV Panel all equipment cleaning
