Problem found: lode shell connection terminal circuit problem found.














Problem found: lode shell connection terminal circuit problem found.














Problem: after power up time ACB do not close from the SCADA command.Problem found: DTW 114 UVR its burn inside circuit . UVR…
To solve this problem, we increase the height 1 meter more and change the direction.
ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4
PIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 2.6.kg ✅ OK 02 102 2.1.kg ✅ OK 03…
IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust
One Comment