DTW-113 LIT,PIT,FIT isolation due to regeneration
Posted onUnable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
PIT Installation
Posted onDTW-205 1Nos New PIT Installation Done DTW-211 1Nos New PIT Installation Done DTW-104 1Nos Old PIT Installation Done
ACTIVITY | CCTV | DAILY REPORTS | DTW | ParvezDTW-122 & 123 Optical Fiber Maintenance
Posted onDTW-122,123 optical fiber maintenance: We check TJ box in both dtw. Optical fiber checked by Leaser Light. Leaser light throw from dtw-122 to…
IRP-1/2 Optical Fiber Maintenance Report
Posted onIRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…