1.1 Nos New Camera Installation . 2. IP Setup


1.1 Nos New Camera Installation . 2. IP Setup
Findings: Lots of hanging TJ box is visiable. Action Taken: Reduce TJ box replacing optical fiber.
Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…
1.Cable connector change 2. IP Setup
1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup
DTW-120 CCTV Maintenance There was connector Problem. Now DTW-120 (5 nos ) camera operation in NAV-2