ACTIVITY PWID36:DTW213 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | CCTV | DTW DTW-202 CCTV Maintenance Posted onNovember 2, 2022November 2, 2022 1.one new camera installation 2. Connector Change 3.IP Setup
ACTIVITY PWID14:DTW114 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
CCTV | Parvez | REPORTS IRP-2 Sub-station optical fiber arrangement done. Posted onNovember 23, 2023November 23, 2023
ACTIVITY Field Pump Checking & Maintenance. Posted onDecember 3, 2023December 3, 2023 Checking and maintenance of 2 field pumps completed.
ACTIVITY | DTW | Parvez DTW-217 and 103 VFD controller Drive Installation Done Posted onNovember 5, 2022November 5, 2022 1.VFD Controller Installation 2.Modbus Serial Communication Cable Check