1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang



1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
Booster Pump (F) Motor Bearing Temperature Mismatch Between field and SCADA
There was a damaged LIT. After regeneration work we have install a new LIT
Findings: SFP problem found in 1 Nos S-Ring switch. As a result, 172.16.100.110,111,113,115 I/P assigned camera’s view isn’t shown in SCADA monitor. Action…
FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…