- 1 new camera installation
2. UTP cable change
3. Connector change
4. IP Setting
5. IP Seating




2. UTP cable change
3. Connector change
4. IP Setting
5. IP Seating
Findings: The cable was disconnected. Action taken: Dressing the cable and reconnect.
PIT maintenance work reportDtw-213 maintenance. Now okDtw-208 maintenanceNow okDtw-207 maintenanceNow okDtw-211 PIT damagedDtw-203 PIT doesn’t exist.Dtw-205 PIT damagedDtw-206 SCADA PACK doesn’t exist
VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…
The Rehabilitation work is on going as long as 6 month. Any scenario of development of this DTW isn’t shown.After visiting this DTW,…