- CCTV Pool Adjustments
- One new camera & one old camera installation
- UTP Cable change
- Connector Change
- IP Setup
































1 new camera installation 2. UTP cable change 3. Connector change 4. IP Setting 5. IP Seating
DTW-205 1Nos New PIT Installation Done DTW-211 1Nos New PIT Installation Done DTW-104 1Nos Old PIT Installation Done
Observation: DTW 118 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 118, We checked up to 10 minutes. RSSI…
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…