1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done






1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
Problem: after power up time ACB do not close from the SCADA command.Problem found: DTW 114 UVR its burn inside circuit . UVR…
IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little…
DTW-120 CCTV Maintenance There was connector Problem. Now DTW-120 (5 nos ) camera operation in NAV-2