DTW-113 Scada Pack Programing And Install Done




DTW-113 Scada Pack Programing And Install Done




IRP-2 RTU Panel, Server Panel & VFD Panel Cleaning Done
MOV Report 2022 November IRP1 SL NO MOV ID Status Remarks 1 2V03A ✅OK 2 2V03B ✅OK 3 2V03C ✅OK 4 2V03D ✅OK…
IRP-1 Sand Filter FCP Panel Cleaning Done
Findings: UVR being under voltage, it need a reset to execute Close Command. Action: ACB open/close command relay check. Isolate the physical reset…
Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…