There was a damaged LIT. After regeneration work we have install a new LIT
Similar Posts
VCB Installation & Commissioning
Posted on
Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS
IRP-2 Sub-Station Re cleaning
Posted on
There was so much dust
ACTIVITY | DAILY REPORTS | DTW | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez
DTW-107 Radio Communication Check and Maintenance
Posted on
Radio Communication problem solve and there are graphical problem in SCADA DTW 107 radio comm. checking complete.গত ৩১/১০/২০২২ তারিখ বিকাল 06:18 pm এর…