Breaker installation for SCADA control Room Monitor Done
Similar Posts
SCADAPACK Report 2022
Posted on
SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…
Report: IRP-1 Electrical Room RTU Panel Preventive Maintenance.
Posted on
Cleaning Status: Completed. Findings: No problem found.
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS
FCP Panel Cleaning
Posted on
IRP-1 Sand Filter FCP Panel Cleaning Done
Instrumentation Findings of Month (July,2022)
Posted on
SL/NO PROBLEMS TAG LOCATION REMARK 1 When the pump runs, the pump Motor + MOV runs together. Which does not follow the normal…
Scada Related Problem ( PIT Interlock )
Posted on
PIT Interlock
FIT Report 2022
Posted on
FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…