IRP-1 Sand Filter FCP Panel Cleaning Done












IRP-1 Sand Filter FCP Panel Cleaning Done
DTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup