ACTIVITY | DTW | Jewel | Pappu | Parvez CCTV camera maintenance & optical fiber rearrangement at DTW-117 Posted onOctober 6, 2022October 6, 2022 In DTW-117, there are 2 Nos maintenance and installation : 1. Optical fiber rearrangement. 2. 2 Nos new camera install. 3. 44 meter…
ACTIVITY | DTW | Jewel | Pappu LOCAL PIPE LINE e-PRV & MOV MODIFICATION WORK. Posted onOctober 29, 2022October 29, 2022
ACTIVITY PROSOSED SYSTEM FOR CONTRACTOR WORK ENVIRONMENT Posted onSeptember 14, 2022September 14, 2022
DAILY REPORTS | REPORTS MOV REPORT 2022 Posted onNovember 3, 2022December 11, 2022 MOV Report 2022 November IRP1 SL NO MOV ID Status Remarks 1 2V03A ✅OK 2 2V03B ✅OK 3 2V03C ✅OK 4 2V03D ✅OK…
ACTIVITY DTW-211,212,213,214,215 RTU and CCTV panel Cleaning Posted onDecember 4, 2023December 4, 2023