Similar Posts
ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTSCCTV Maintenance At DTW-101
Posted on1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup
Electrical Team Monthly work plan(September-22)
Posted onSl No. Date Location Task Name Work update Remarks 2 9/3/2022 33 KV interlink HT Network visual checking & Monthly tree trimming work….
ACTIVITY | DAILY REPORTS | Parvez | REPORTSDTW-219 & 220 Cleaning
Posted onDtw-220 & 219 RTU, VFD & CCTV Panel all equipment cleaning
DTW-211,212,213 VFD, RTU & CCTV Panel Cleaning
Posted onThere was so much dust SUMMARY যে সকল ডিপটিবলগুলোতে বালুর পরিমান অনেক বেশি এবং তুলনামূলক ঘাস নেই সেই সকল ডিপটিবলের যন্ত্রপাতি গুলো অতি…
DTW- 107 Radio Communication checking complete.
Posted onObservation: DTW 107 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 107, We checked up to 10 minutes. In…
DTW#106,117,118 AND 223 PTT AND UVR CHECKING COMPLETE
Posted on106,117,118 এবং 223 এই DTW গুলো তে আগে পাওয়ার চলে গেলে ফল্ট ধরে রাখত যার কারণে অপরেশন টিম থেকে লোক পাঠিয়ে এটা রিসেট…