DTW-113 LIT,PIT,FIT isolation due to regeneration
Posted onUnable to take LIT, due to keep heavy machinery in DTW compound. We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply…
ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTSIRP-2 RTU & VFD Panel Cleaning
Posted onIRP-2 RTU Panel, Server Panel & VFD Panel Cleaning Done
ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTSDTW-101 Start Stop Problem Check
Posted on
ACTIVITY | DAILY REPORTS | Parvez | REPORTSOGR Booster room dewatering pump run command showing problem at low level
Posted onFloat switch reconnection and rearrange. Now normal