PWID: 74, 75, 76, 77, 78, 79, 80, 81
It’s just a preventive work to avoid upcoming problems of Field Devices & Instruments.
PWID: 74, 75, 76, 77, 78, 79, 80, 81
It’s just a preventive work to avoid upcoming problems of Field Devices & Instruments.
SL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
On/Off switch problem found. Need to change the switch. On/Off switch replace done. Now ELD operational.
Cable connector pin damage found. Change UTP connector & PoE to ONU short cable.
Problem Findings By Team ICE IRP-2 Sludge drying bed pump control circuit get short circuit. Lot of cable damaged by Ant. Need to…