ACTIVITY | DAILY REPORTS | DTW | Jewel | ParvezPIT Maintenance Work Report (IRP-1)
Posted onDTW-114 PIT ok. DTW-113 PIT ok but scadapack AO port damaged. DTW-104 PIT doesn’t exist. DTW-105 PIT ok (regeneration on going)
Usha Martin 12 Core Optical Fiber Cable
Posted onSpecification SL No Specification criteria Specifications 1 Brand Name Usha Martin 2 Model 12 3 Diameter 6 mm 4 Type Single Mode 5…
IRP-1 DTW RTU,VFD & CCTV Panel Cleaning
Posted onDtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .
VFD Report 2022
Posted onVFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…
DTW- 201 Radio Communication checking complete.
Posted onObservation: DTW 201 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 201, We checked up to 10 minutes. In…
DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING
Posted onDTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING COMPLETE There was so much dust