SL. No. | Date | WID: Task Description | Location | Manpower | Remarks |
2 November | PWID60: DTW-101 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-101 | Parvas-AT Ahsanullah-Ele | PIT works but display problem. Need to change FIT connection terminal box. (02.11.2023) | |
2 November | PWID61: DTW-102 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-102 | Parvas-AT Ahsanullah-Ele | LIT is stucken in flexible pipe. Need to change FIT connection terminal box. (02.11.2023) | |
4 November | PWID62: DTW-103 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-103 | Parvas-AT Ahsanullah-Ele | Need to change FIT connection terminal box. (02.11.2023) | |
4 November | PWID63: DTW-104 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-104 | Parvas-AT Ahsanullah-Ele | LIT is stucken in flexible pipe. Need to change FIT connection terminal box. (04.11.2023) | |
5 November | PWID64: DTW-105 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-105 | Parvas-AT Ahsanullah-Ele | LIT damage. LIT is stucken in flexible pipe. Need to change FIT connection terminal box. (04.11.2023) | |
5 November | PWID65: DTW-106 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-106 | Parvas-AT Ahsanullah-Ele | LIT is stucken in flexible pipe. (04.11.2023) | |
6 November | PWID66: DTW-107 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-107 | Parvas-AT Ahsanullah-Ele | Need to change FIT connection terminal box. (04.11.2023) | |
6 November | PWID67: DTW-109 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-109 | Parvas-AT Ahsanullah-Ele | ||
7 November | PWID68: DTW-110 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-110 | Parvas-AT Ahsanullah-Ele | Need to change FIT connection terminal box. LIT is stucken in flexible pipe. (05.11.2023) | |
7 November | PWID69: DTW-111 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-111 | Parvas-AT Ahsanullah-Ele | Need to change FIT connection terminal box. LIT is stucken in flexible pipe. (05.11.2023) | |
8 November | PWID70: DTW-112 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-112 | Parvas-AT Ahsanullah-Ele | ||
8 November | PWID71: DTW-113 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-113 | Parvas-AT Ahsanullah-Ele | Need to change FIT connection terminal box. | |
9 November | PWID72: DTW-114 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-114 | Parvas-AT Ahsanullah-Ele | Need to change FIT connection terminal box. | |
9 November | PWID73: DTW-115 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-115 | Parvas-AT Ahsanullah-Ele | Need to change FIT connection terminal box. LIT is stucken in flexible pipe. | |
11 November | PWID74: DTW-116 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-116 | Parvas-AT Ahsanullah-Ele | Okay | |
11 November | PWID75: DTW-117 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-117 | Parvas-AT Ahsanullah-Ele | LIT is stucken in flexible pipe. | |
12 November | PWID76: DTW-118 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-118 | Parvas-AT Ahsanullah-Ele | Oaky | |
12 November | PWID77: DTW-119 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-119 | Parvas-AT Ahsanullah-Ele | LIT is stucken in flexible pipe. | |
13 November | PWID78: DTW-120 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-120 | Parvas-AT Ahsanullah-Ele | LIT is stucken in flexible pipe. | |
13 November | PWID79: DTW-121 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-121 | Parvas-AT Ahsanullah-Ele | Oaky | |
14 November | PWID80: DTW-122 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-122 | Parvas-AT Ahsanullah-Ele | LIT is stucken in flexible pipe. | |
14 November | PWID81: DTW-123 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-123 | Parvas-AT Ahsanullah-Ele | ||
15 November | PWID82: DTW-201 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-201 | Parvas-AT Ahsanullah-Ele | ||
15 November | PWID83: DTW-202 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-202 | Parvas-AT Ahsanullah-Ele | ||
16 November | PWID84: DTW-203 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-203 | Parvas-AT Ahsanullah-Ele | ||
16 November | PWID85: DTW-204 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-204 | Parvas-AT Ahsanullah-Ele | ||
18 November | PWID86: DTW-205 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-205 | Parvas-AT Ahsanullah-Ele | ||
18 November | PWID87: DTW-206 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-206 | Parvas-AT Ahsanullah-Ele | ||
19 November | PWID89: DTW-207 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-207 | Parvas-AT Ahsanullah-Ele | ||
19 November | PWID90: DTW-208 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-208 | Parvas-AT Ahsanullah-Ele | ||
20 November | PWID91: DTW-209 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-209 | Parvas-AT Ahsanullah-Ele | ||
20 November | PWID92: DTW-210 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-210 | Parvas-AT Ahsanullah-Ele | ||
21 November | PWID93: DTW-211 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-211 | Parvas-AT Ahsanullah-Ele | ||
21 November | PWID94: DTW-212 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-212 | Parvas-AT Ahsanullah-Ele | ||
22 November | PWID95: DTW-213 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-213 | Parvas-AT Ahsanullah-Ele | ||
22 November | PWID96: DTW-214 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-214 | Parvas-AT Ahsanullah-Ele | ||
23 November | PWID97: DTW-215 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-215 | Parvas-AT Ahsanullah-Ele | ||
23 November | PWID98: DTW-216 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-216 | Parvas-AT Ahsanullah-Ele | ||
25 November | PWID99: DTW-217 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-217 | Parvas-AT Ahsanullah-Ele | ||
25 November | PWID100: DTW-218 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-218 | Parvas-AT Ahsanullah-Ele | ||
26 November | PWID101: DTW-219 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-219 | Parvas-AT Ahsanullah-Ele | ||
26 November | PWID102: DTW-220 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-220 | Parvas-AT Ahsanullah-Ele | ||
27 November | PWID103: DTW-221 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-221 | Parvas-AT Ahsanullah-Ele | ||
27 November | PWID104: DTW-222 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-222 | Parvas-AT Ahsanullah-Ele | ||
28 November | PWID105: DTW-223 RTU, LIT, PIT, FIT clean check & maintenance. | DTW-223 | Parvas-AT Ahsanullah-Ele | ||
28 November | PWID106: IRP-1 Sandfilter All FCP & LOP panel clean. | IRP-1 | Parvas-AT Ahsanullah-Ele | ||
29 November | PWID107: IRP-2 Sandfilter All FCP & LOP panel clean. | IRP-2 | Parvas-AT Ahsanullah-Ele | ||
29 November | PWID108: IRP-1 All PLC server panel clean. | IRP-1 | Parvas-AT Ahsanullah-Ele | ||
29 November | PWID109: IRP-2 All PLC server panel clean. | IRP-2 | Parvas-AT Ahsanullah-Ele | ||
30 November | PWID110: IRP1 all DTW ELD, UVR and Serial communication cable terminal check and clean. | IRP-2 | Parvas-AT Ahsanullah-Ele | ||
29 November | PWID111: IRP2 all DTW ELD, UVR and Serial communication cable terminal check and clean. | IRP-1 | Parvas-AT Ahsanullah-Ele |
LIT, PIT, FIT REPORT – NOVEMBER 2023