IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check.
Posted on
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
DTW-201,202,203,206,208,209,210,211 CCTV Maintenance
Posted on
1.Camera IP reset 2.New IP install
ACTIVITY | DAILY REPORTS | DTW | Pappu | Pending Issue
DTW- 114 UVR & UVR Related M/C checking complete.
Posted on
Problem: after power up time ACB do not close from the SCADA command.Problem found: DTW 114 UVR its burn inside circuit . UVR…
ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS
CCTV Maintenance At DTW-105
Posted on
2 Nos New Camera Installation . 2. new 20m utp cable install 3. connector change 4. IP Setup
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
OGR booster pump D winding temperature & Bearing temperature sensor checking.
Posted on
Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….