ACTIVITY PWID45:DTW-223 Bullet camera glass and cage Cleaning. Posted onNovember 15, 2023November 15, 2023
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez Instrumentation of Month (September,2022) Posted onSeptember 4, 2022October 17, 2022 Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…
ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS CCTV Maintenance At DTW-101 Posted onOctober 23, 2022December 11, 2022 1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez EPRV work with DTW 103 by ICE Team & SEL Posted onOctober 22, 2022October 22, 2022
ACTIVITY | Jewel | Pappu | Parvez IRP-1 Dhaka City flowmeter FIT-4004 data collection for calibration with GKBL. Posted onSeptember 12, 2022September 12, 2022