ACTIVITY PWID46:DTW101 to 106 TJ Box sealing with silicon glue. Posted onNovember 16, 2023November 16, 2023
ACTIVITY DTW-206,207,209 RTU,CCTVÂ Panel and VFD Cleaning Posted onDecember 20, 2023December 20, 2023
ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS CCTV Maintenance At DTW-101 Posted onOctober 23, 2022December 11, 2022 1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup
ACTIVITY PWID5:DTW105 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY PROSOSED SYSTEM FOR CONTRACTOR WORK ENVIRONMENT Posted onSeptember 14, 2022September 14, 2022
ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pappu | Pending Issue Radio communication checking complete DTW 221. Posted onOctober 6, 2022October 12, 2022 Observation: Radio communication checking complete DTW 221.1. In DTW 221, We checked up to 10 minutes. RSSI Value (Dc volts) MAX: 2.700V, MIN:…