ACTIVITY PWID51:DTW210 to 222 TJ Box sealing with silicon glue. Posted onNovember 25, 2023November 25, 2023
ACTIVITY | DAILY REPORTS | Jewel | MOV | Pappu | Parvez OGR Booster pump (E) checking complete. Posted onSeptember 7, 2022September 7, 2022 Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E). In this case the valve…
ACTIVITY | DAILY REPORTS | DTW DTW-113 Scada Pack Install Posted onNovember 6, 2022November 6, 2022 DTW-113 Scada Pack Programing And Install Done
ACTIVITY PWID5:DTW105 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | REPORTS IRP-2 All FCP panel cleaning Posted onNovember 24, 2022November 26, 2022 IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
ACTIVITY PWID27:DTW204 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023