ACTIVITY | DAILY REPORTS | MOV | Pappu | Parvez
IRP-2 3V07A MOV Reset, reprogramming and configuration work complete.
Posted on
Problem: This MOV is abnormal working. MOV Open time & close time 0% to 100% value not showing. IRP-2 3V07A MOV Reset, reprogramming…
Radio communication checking complete DTW 221.
Posted on
Observation: Radio communication checking complete DTW 221.1. In DTW 221, We checked up to 10 minutes. RSSI Value (Dc volts) MAX: 2.700V, MIN:…
Field Pump Checking & Maintenance.
Posted on
Checking and maintenance of 2 field pumps completed.
DTW- 106 CCTV Pool And UTP Cable Installation
Posted on
1.CCTV Pool Installation 2.CCTV Camera Cage Installation 3.UTP Cable Installation
ACTIVITY | DAILY REPORTS | Parvez | REPORTS
Breaker installation for SCADA control Room Monitor.
Posted on
Breaker installation for SCADA control Room Monitor Done