ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS IRP-2 Server Rack Installation and Optical Fiber Rejoin Posted onNovember 17, 2022November 17, 2022 IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
ACTIVITY PWID25:DTW202 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DTW | DTW103 EPRV Work DTW-117 By ICE Team & SEL Posted onOctober 22, 2022October 22, 2022 DTW-117
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez OGR booster pump D winding temperature & Bearing temperature sensor checking. Posted onSeptember 18, 2022September 18, 2022 Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….
ACTIVITY PWID30:DTW207 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY PWID45:DTW223 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023