1.1 Nos New Camera Installation . 2. connector change 3. IP Setup



1.1 Nos New Camera Installation . 2. connector change 3. IP Setup
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
Level Sensor Report October 2022 SL NO. DTW NO. STATIC LEVEL PUMPING LEVEL Type STATUS 01 101 5.8 ❎Level Sensor problem. 02…
1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup
IRP-2 Sand Filter All Ultrasonic Sensor Cleaning Complete.