1.Cable connector change 2. IP Setup



1.Cable connector change 2. IP Setup
1 :MW03B 2: MW14A 3:MW08A 4: MW13B
DTW-106 CCTV Base Placement Done
Problem: after power up time ACB do not close from the SCADA command.Problem found: DTW 114 UVR its burn inside circuit . UVR…