1.Cable connector change 2. IP Setup
Similar Posts
Field Pump Checking & Maintenance.
Posted on
Checking and maintenance of 2 field pumps completed.
ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS
IRP-2 Sub-Station Re cleaning
Posted on
There was so much dust
DTW-211,212,213 VFD, RTU & CCTV Panel Cleaning
Posted on
There was so much dust SUMMARY যে সকল ডিপটিবলগুলোতে বালুর পরিমান অনেক বেশি এবং তুলনামূলক ঘাস নেই সেই সকল ডিপটিবলের যন্ত্রপাতি গুলো অতি…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue
OGR Booster pump E checking & maintenance.
Posted on
Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez
Chlorine cylinder lode shell checking and maintenance.
Posted on
Problem found: lode shell connection terminal circuit problem found.